CEQA/Section 18
Perris Valley Channel Lateral B Stage 4 Project
Wildomar Master Drainage Plan Lateral C Revision Project
- Wildomar MPD Lateral C_Public Notice_237307 (pdf file - 483 KB)
- Wildomar MPD Lateral C_Draft IS-MND_237334 (pdf file - 3 MB)
- Appendix A (pdf file - 1.4 MB)
- Appendix B (pdf file - 8.1 MB)
- Appendix C (pdf file - 12.3 MB)
- Appendix D (pdf file - 3.0 MB)
- Appendix E (pdf file - 18.4 MB)
- Appendix F (pdf file - 10.5 MB)
- Appendix G (pdf file - 252 KB)
- Appendix H (pdf file - 79.2 MB)
El Cerrito Channel Restoration Project
- El Cerrito Channel Resolution NO. F2021-01 (pdf file - 20 KB)
- Attachment A (pdf file - 1.69 MB)
- Attachment B (pdf file - 61.3 KB)
Woodcrest Dam Restoration Project Materials Listing
- Woodcrest Resolution NO. F2020-32 (pdf file - 28 KB)
- Attachment A (pdf file - 4.76 MB)
- Attachment B (pdf file - 976 KB)
- Attachment C (pdf file - 624 KB)
San Jacinto River Stage 3 Master Drainage Plan
- Initial Study - 10-17-19 (pdf file - 4.4 MB)
- Notice of Preparation - Revised 10-17-19 (pdf file - 3 MB)
- Appendices (zip file - 2.6 GB)
Lakeland Village MDP Line H Stage 1 - Final Addendum to the PEIR and Notice of Determination
Project Location Maps for Norco MDP Line NA-1 Stage 2 and Lateral NA-1 Stage 1 Project
Engineer’s Statement for Norco MDP Line NA-1 Stage 2 and Lateral NA-1 Stage 1 Project