Santa Ana River Basin - Riverside Levees Rehabilitation Project

Project Description

This U.S. Army Corps of Engineers (USACE) led Santa Ana River Basin- Riverside Levees Rehabilitation Project will rehabilitate damaged portions of the Federally constructed Riverside Levee 1 (West levee) and Riverside Levee 2 (East levee), collectively the "Riverside Levees," which are part of the Santa Ana River levee system. Approximately 9,000 feet of the West levee will be rehabilitated starting from Market Street and continue southwesterly downstream to just past Capary Road. Approximately 4,000 feet of the East levee will be rehabilitated starting from the County line and continue southwesterly downstream to approximately Columbia Avenue. This project also includes a short reach of the East levee between Market Street and State Route 60. Levee rehabilitation will include replacing and grouting the existing levee rock slope protection, as well as extending the rock slope protection (see Exhibits 1 & 2 below)

Exhibit 1 – Riverside Levees Exhibit

Exhibit 2 – Levee Cross Section

 

Project Purpose, Need and Benefits

The purpose of the Santa Ana River levee system is to reduce the potential for Santa Ana River flows to break out of the channel and flood adjacent properties. The levees range from 15 ft. to 22 ft. in height above the elevation of the riverbed. The levees were originally designed in the 1950’s to convey a flow of approximately 195,000 cubic ft. per second (cfs), well in excess of the estimated 100- year flow of 140,000 cfs.

A series of storms from December 2010 to January 2011 resulted in substantial flows in the Santa Ana River and damaged portions of the Santa Ana River levee system. Inspections performed by the Riverside County Flood Control and Water Conservation District and USACE in June 2011 identified damages to the Riverside Levees, including intermittent erosion at the toe of the riverward slope and the erosion of several groins on both banks of the river. Most of the damage was to the groins, which act as rock brake pads to slow the flow of water near the levee.

The rehabilitation of Riverside Levees is authorized by Public Law 84-99. Public Law 84-99 authorizes USACE to assist local governments with the rehabilitation of Federal and non-Federal flood risk management projects damaged by flooding.

The Riverside Levees rehabilitation project will not only restore but enhance the levees to ensure they continue to protect approximately $1.5 billion of infrastructure. The project will ensure flood protection for more than 4,300 structures, of which more than 4,000 are residential structures in the Riverside and Jurupa Valley areas. A summary of the structures being protected by Santa Ana River levee system is provided in Table 1 and Figure 1 below. In addition to protecting property, the rehabilitation project will provide additional scour protection and integrity to the Riverside Levees.

 

Figure 1: Location of Structures being protected by the Riverside Levees Project

 

Table 1: Summary of Structures protected by the Riverside Levees Project

 

Santa Ana River Trail Update

Beginning on September 12th, 2022, and over the following six weeks, be advised that the Santa Ana River Trail will be impacted in two separate areas due to construction activities.  As the construction crews cross the trail behind Carlson Bark Park and between Route 60 and Market Street into the Santa Ana River to begin working on the Santa Ana River Basin - Riverside Levees Rehabilitation Project, traffic control flaggers will guide foot, bike, and truck traffic accordingly to minimize delays to the trail user. 

Note that pedestrians, cyclists, and others who frequent the trail will still have the opportunity to do so but may experience delays on their journey.

The graphic shows the extent to which the trail will be impacted.

Project Status and Outreach to Those Experiencing Homelessness Within the Santa Ana River Construction Area

Click on image for larger view

Click on image for larger view

The levee rehabilitation project is scheduled to begin construction in September 2022. Construction is estimated to take four years.

To protect the safety of those that are experiencing homelessness in the river bottom, the Riverside County Flood Control and Water Conservation District began a partnership with local city, county and non-profit outreach teams and service providers in September of 2021 to educate those dwelling in the river about the pending project and to offer services including housing alternatives ahead of construction. For the past year staff from multiple agencies have been communicating the importance and timeline of the project, partnering to identify safe shelter, and providing options for storing belongings. Additionally, as the project progresses, the Riverside County Flood Control and Water Conservation District and its partners will continue to reach out to impacted area inhabitants to provide education, support services and information on when they should plan to move to keep them safe from the construction activities and allow time to find alternative accommodations as the project progresses along the river.

 

Resources

If you need shelter, please contact:

Path of Life Ministries Family Shelter

(951) 462-9822; hotline@pathoflife.com

or

Riverside County HomeConnect

(800) 498-8847; HomeConnect@ruhealth.org

For Health and Social Services Referrals Call: 2-1-1


Riverside County Flood Control and Water Conservation District

Contact Us

  1995 Market St. Riverside, CA 92501
  Phone (951) 955-1200
  Fax (951) 788-9965

Mon-Fri 8:00am - 5:00pm

Riverside County Flood Control and Water Conservation District Seal

OUR MISSION - We responsibly manage stormwater in service of safe, sustainable, and livable communities.

Terms Of UsePrivacy StatementCopyright 2022 Riverside County Flood Control and Water Conservation District
Back To Top