Mockingbird Canyon Stabilization, Stage 3
Project Scope
This District-led project contains roughly two miles of improvements along Mockingbird Canyon Wash from Pennington Place bridge to the Van Buren crossing downstream. The primary objective for this project is to stabilize Mockingbird Canyon Wash and reduce sediment transport and erosion that can damage public infrastructure and adjacent residences. The drainage improvements are anticipated to consist of soil bank protection and grade control structures, with a majority of the bottom left earthen and allowed to revegetate naturally. The project includes two new crossings, one at Greenview Drive and another downstream for additional residential access. The project will also replace the existing Pennington Place bridge as well as provide an opportunity for a future trail system to be established by other entities. The District will be responsible for operation and maintenance of the facility (not including future trails).
Contact
Michael Venable - Engineering
P: 951-955-1270
E: [email protected]
Yolanda K. Wilder - Right-of-Way Acquisition
P: 951-955-1304
E: [email protected]
Project Location
Project Status
The District is currently working towards completion of the Plans, Specifications, Estimates, and Regulatory Permits for the Project.
The District's Real Estate Services Team will begin reaching out to local residents in May 2025 to negotiate the acquisition of portions of Right-of-Way needed to construct the Project. Please contact the District with any questions regarding the project.